5GHz 802.11ac 900Mbps Outdoor Wireless CPE

» WBS-512AC

Flexible and Reliable Outdoor Wireless Solution with Superior Performance

PLANET WBS-512AC 802.11ac WAVE 2 900Mbps Outdoor Wireless CPE offers a better range and excellent throughput than those of the traditional wireless device. With the standard IEEE 802.3at Power over Ethernet (PoE) design, the WBS-512AC can be easily installed in the areas where power outlets are not available. The WBS-512AC is definitely suitable for wireless IP surveillance, and bridge link of building to building and backbone of public service. Additionally, the self-healing capability keeps connection alive all the time. With the IP55-rated outdoor enclosure, the WBS-512AC can perform normally under rigorous weather conditions, meaning it can be installed in any harsh, outdoor environments.

edm WBS 512AC

 

Benefits of MU-MIMO under 802.11ac Wave 2

With the MU-MIMO Wave 2 technology, the WBS-512AC, installed in public areas such as hotspots, airports and conferences, reduces the frustration that Wi-Fi users often experience in downloading web pages, e-mail file attachments and media contents. For cellular operators, the WBS-512AC provides a better Wi-Fi user experience, reducing the likelihood of users turning off Wi-Fi and putting more load on the cellular network. For enterprises, this technology also can solve Wi-Fi congestion issues in open work spaces and conference rooms.

WBS 512AC 1

 

Designed for Various Requirements

The WBS-512AC is specially designed for long-distance outdoor surveillance and wireless backhaul solutions that are capable of establishing stable bridge connection through the embedded 14dBi unidirectional antenna. To provide maximum performance, the WBS-512AC can implement up to 6 operation modes and is easy to use where a multitude of applications in communities, warehouses, campuses, harbors, etc. can be made.

WBS 512AC 2

 

3 Simple Steps to Set Up PtP Connection

Without needing to enter the Web interface for configuration, the WBS-512AC has the DIP switch for setting to master (AP mode) and to slave (repeater mode). User only needs three simple steps to establish the PtP connection without any difficulty. By just switching the button to “Master” on the master AP, and pressing the reset button, the PtP connection can be established in 2 minutes as the connection steps are shown below.

WBS 202N WBS 502N 1.1

 

Multiple SSIDs with VLAN Tagging

The WBS-512AC supports WPA/WPA2, and the 802.1X RADIUS authentication to secure the wireless connection. Besides, the supported IEEE 802.1Q VLAN allows multiple VLAN tags to be mapped to multiple SSIDs to distinguish the wireless access. This makes it possible for the WBS-512ACN to work with managed Ethernet switches to have VLANs assigned to a different access level and authority.

WBS 202N WBS 502N 3

 

Flexible and Reliable Outdoor Characteristics

The WBS-512AC is definitely suitable for wireless IP surveillance, and bridge link of building to building and backbone of public service. Additionally, the self-healing capability keeps connection alive all the time. With the IP55-rated outdoor enclosure, the WBS-512AC can perform normally under rigorous weather conditions, meaning it can be installed in any harsh, outdoor environments. With the flexible DC input or Power over Ethernet (PoE) option, the WBS-512AC can be easily installed depending on the environmental condition.

 

Optimized Efficiency in AP Management 

The brand-new GUI configuration wizard helps the system administrator easily set up the WBS-512AC step by step. Besides, the built-in Wi-Fi analyzer provides real-time channel utilization to prevent channel overlapping to assure greater performance. With the automatic transmission power mechanism, distance control and scheduling reboot setting, the WBS-512AC is easy for the administrator to deploy and manage without on-site maintenance. Moreover, you can use PLANET NMS-500 or NMS-1000V AP control function to deliver wireless profiles to multiple APs simultaneously, thus making the central management simple.

WBS 512AC 4

 

Long-distance Connection 

PLANET WBS-512AC is specially designed for long-distance outdoor surveillance and wireless backhaul solutions that are capable of providing farther connection through the built-in 14dBi dual-polarity antenna. It supports MU-MIMO WAVE 2.0 that can offer the more powerful transmission speed for data rate. With multiple operation modes and adjustable Tx power, it is easy to install and adjust the suitable setting in appropriate locations. In the aspect of management, the traffic shaping and IEEE 802.1Q VLAN that the WBS-512AC features regulate network data transfer by delaying the flow of less important or less desired packets. Furthermore, the self-healing capability keeps connection alive all the time, thus reducing the maintenance effort and deployment cost.

 

Industrial Compliant Wireless LAN and LAN

  • Compliant with the IEEE 802.11a/n/ac WAVE2 MU-MIMO wireless technology
  • 2T2R architecture with data rate of up to 900Mbps
  • Equipped with two 10/100/1000Mbps RJ45 ports with auto MDI/MDI-X supported

 

Fixed Network Broadband Router

  • Supported WAN connection types: DHCP, Static IP, PPPoE
  • Supports Port Forwarding and DMZ for various networking applications
  • Supports DHCP server in Gateway/WISP mode

 

RF Interface Characteristics

  • Built-in 14dBi dual-polarization antenna
  • High output power with multiply-adjustable transmit power control

 

Outdoor Environmental Characteristics

  • IP55 rating
  • IEEE 802.3 at Power over Ethernet design
  • Operating temperature: -20~70 degrees C

 

Multiple Operation Modes and Wireless Features

  • Multiple operation modes: AP, Gateway, Repeater, Super WDS, WISP
  • WMM (Wi-Fi multimedia) provides higher priority to multimedia transmitting over wireless
  • Coverage threshold to limit the weak signal of clients occupying session
  • Real-time Wi-Fi channel analysis chart and client limit control for better performance
  • Support Terminal Fast Roaming with 802.11k, 802.11v, and 802.11r

 

Secure Network Connection

  • Full encryption supported: WPA/WPA2, WPA-PSK/WPA2-PSK and 802.1X RADIUS authentication
  • Supports 802.1Q VLAN and SSID-to-VLAN mapping
  • Supports IP/Port/MAC address/URL filtering, DoS, SPI Firewall
  • Supports DMZ and Port Forwarding
  • Bandwidth control per IP address to increase network stability

 

Easy Installation and Management

  • 3 simple steps to establish PtP ( AP + Repeater ) connection easily
  • Supports PLANET NMS Controllers in AP mode
  • Easy discovery by PLANET Smart Discovery
  • Self-healing mechanism through system auto reboot setting
  • System status monitoring through remote Syslog Server
  • Supports PLANET DDNS/Easy DDNS

 

Hardware
Standard SupportIEEE 802.11a/n/ac
IEEE 802.11i
IEEE 802.3 10BASE-T
IEEE 802.3u 100BASE-TX
IEEE 802.3x flow control
IEEE 802.11k, 802.11v, and 802.11r
Dimensions (W x D x H)87 x 38 x 260 mm
Weight405g
Power Requirements48V DC IN,0.5A, IEEE 802.3 at PoE+ or
12V DC IN, 1.0A from DC Jack
Power Consumption (max.)< 10W
InterfaceWireless IEEE 802.11a/n/ac, 2T2R
PoE: 1 x 10/100/1000BASE-TX, auto-MDI/MDIX, 802.3 at PoE In
LAN: 1x 10/100/1000BASE-TX, auto-MDI/MDIX
ButtonReset/Pair button, PtP Switch
AntennaBuilt-in 14dBi directional antenna with dual polarization

Half-power beam width
Horizontal: 50 degrees
Vertical: 15 degrees

Data RateIEEE 802.11a: up to 54Mbps
IEEE 802.11n (20MHz): up to 150Mbps
IEEE 802.11n (40MHz): up to 300Mbps
IEEE 802.11ac (80MHz): up to 867Mbps
Media Access ControlCSMA/CA
Modulation802.11 a/n/ac: OFDM (BPSK / QPSK / 16QAM / 64QAM / 256QAM)
Frequency BandFCC: 5.180~5.240GHz, 5.745~5.825GHz
ETSI: 5.180~5.700GHz
Operating ChannelsFCC: 36, 40, 44, 48, 149, 153, 157, 161, 165 (9 channels)
ETSI: 36, 40, 44, 48, 100, 104, 108, 112, 116, 132, 136, 140 (12 channels)

5GHz channel list will vary in different countries according to their regulations.

Max. Transmit Power (dBm)FCC: up to 25 ± 1dBm
ETSI: < 20dBm (EIRP)
Receiver Sensitivity (dBm)
Network ModeData Rate Receive Sensitivity (dBm)
802.11a6Mbps-92
54Mbps-75
802.11n HT20MCS0/MCS8-91
MCS7/MCS15-72
802.11n HT40MCS0/MCS8-88
MCS7/MCS15-70
802.11ac VHT20MCS0-92
MCS8-70
802.11ac VHT40MCS0-89
MCS9-65
802.11ac VHT80MCS0-87
MCS9-61
Environment & Certification
Operating Temperature-20 ~ 70 degrees C
Operating Humidity5 ~ 90% (non-condensing)
IP LevelIP55
ESD Protection± 8kV air-gap discharge
± 4kV contact discharge
Surge Protection± 4kV
RegulatoryCE, RoHS
Software
LANStatic IP/DHCP
Supports IP-MAC binding
WAN Type (GW/WISP mode)
  • Static IP
  • Dynamic IP
  • PPPoE
Wireless Modes
  • Access Point
  • Gateway
  • Repeater
  • Super WDS
  • WISP
Channel Width20MHz, 40MHz, 80MHz
Encryption Type64-/128-bit WEP, WPA, WPA-PSK, WPA2, WPA2-PSK, 802.1X
Wireless SecurityEnable/Disable SSID Broadcast
Wireless Max. 32 MAC address filtering
User Isolation
Max. SSIDs4
Max. Wireless Clients64 per radio (50 is suggested, depending on usage)
Max. WDS Peers4 (Up to 3 peers by using “One-click WDS”)
Wireless QoSSupports Wi-Fi Multimedia (WMM)
Wireless AdvancedAuto Channel Selection
5-level Transmit Power Control (Max. (100%), Efficient (75%), Enhanced (50%), Standard (25%), Min. (12.5%))
Client Limit Control, Coverage Threshold
Wi-Fi channel analysis chart
Fast Roaming(IEEE 802.11k, 802.11r, 802.11v)
Status MonitoringDevice status, wireless client List
PLANET Smart Discovery
DHCP client table
System Log supports remote syslog server
VLANIEEE 802.1Q VLAN (VID: 3~4094)
SSID-to-VLAN mapping up to 4 SSIDs
Self-healingSupports auto reboot settings per day/hour
ManagementRemote management through PLANET DDNS/Easy DDNS
Configuration backup and restore
Supports UPnP
Supports IGMP Proxy
Supports PPTP/L2TP/IPSec VPN Pass-through
SNMP v1/v2c/v3 support, MIB I/II, Private MIB
Central ManagementApplicable controllers: WAPC-500, WAPC-1000, NMS-500, NMS-1000V
DateVersionDescriptionDownload
2020-06-051.0

WBS-512AC

Download Icon
DateVersionDescriptionDownload
2024-10-111.3

Added PSTI function.

Download Icon
2023-09-011.1

Modify contents of Quick Guide.

Download Icon
2020-05-081.0

Initial release

Download Icon
DateVersionDescriptionDownload
2023-09-011.1

Modify contents of user manual.

Download Icon
2020-06-021.0

Initial Release

Download Icon
DateVersionDescriptionDownload
2020-11-181.0

EC Declaration.

Download Icon
DateVersionDescriptionDownload
2024-06-183.0-Build20240411180443-EN

[Release for ETSI Region]
Function Added:
– Added PSTI function.
FW upgrade for PSTIA (Product Security and Telecommunications Infrastructure Act)
*Note: After updating the firmware, you will need to enter the product’s MAC code at the first login. Please record the MAC code before proceeding with the update.

Download Icon
2024-06-183.0-Build20240424103125-EN

[Release for FCC Region]
Function Added:
– Added PSTI function.
FW upgrade for PSTIA (Product Security and Telecommunications Infrastructure Act)
*Note: After updating the firmware, you will need to enter the product’s MAC code at the first login. Please record the MAC code before proceeding with the update.

Download Icon
2021-10-203.0-Build20211011150854-EN

[Release for ETSI Region]
FW upgrade:
1. Added channels:52,56,60,64.
2. Added SW switch for DFS function.

Download Icon
2021-10-203.0-Build20211011145107-EN

[Release for FCC Region]
FW upgrade:
1. Added channels:52,56,60,64.
2. Added SW switch for DFS function.

Download Icon
2020-11-123.0-Build20200923140721-EN

[Release for ETSI Region]
Fixed Failed to change SNMP IP address.

Download Icon
2020-11-123.0-Build20200923121558-EN

[Release for FCC Region]
Fixed Failed to change SNMP IP address.

Download Icon
2020-05-253.0-Build20200521092514-EN

[Release for ETSI Region]
Initial Release.

Download Icon
2020-05-253.0-Build20200521094845-EN

[Release for FCC Region]
Initial Release.

Download Icon

Ordering Information

WBS-512AC

5GHz 802.11ac 900Mbps Outdoor Wireless CPE

Ordering Information

WBS-512AC

5GHz 802.11ac 900Mbps Outdoor Wireless CPE w/ MU-MIMO WAVE 2 (Built-in 14dBi Antenna)
                           
✉

Join Our Newsletter

Get the latest news, offers and updates from PLANET Technology straight to your inbox.

We respect your privacy. Unsubscribe anytime.