Product Meta

  • product_code: WBS-900AC
  • product_editor_4418_tab_content: <p><strong>Long-distance Connection </strong></p> <p>PLANET WBS-900AC is specially designed for long-distance outdoor wireless bridge solutions, capable of establishing a stable bridge connection with a 25dBi high gain dish antenna to provide long-range connection and maximum performance. It supports TDMA technology, reducing interference between users by allowing them to transmit at different times, even when a large number of users share the same frequency band. It is easy to install and adjust suitable settings in appropriate locations. In terms of management, the WBS-900AC features adjustable transmit power control and IEEE 802.1Q VLAN, regulating network data transfer by delaying less important or less desired packets. </p> <p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://www.planet.com.sa/wp-content/uploads/2025/01/WBS-900ACv2-3.png" alt="" width="700" height="245" /></p>
  • product_editor_4418_tab_enabled: yes
  • product_editor_4418_tab_content_changed: yes
  • product_editor_4418_tab_title: Applications
  • product_editor_4421_tab_content: <strong>Industrial Compliant Wireless LAN and LAN</strong> <ul> <li>Compliant with time-division multiple access (TDMA) wireless technology</li> <li>Compliant with the IEEE 802.11a/n/ac WAVE2 MU-MIMO wireless technology</li> <li>2T2R architecture with data rate of up to 900Mbps</li> <li>Equipped with two 10/100/1000Mbps RJ45 ports with auto MDI/MDI-X supported</li> </ul>   <strong>RF Interface Characteristics</strong> <ul> <li>25dBi dual-polarization antenna</li> <li>High output power with multiply-adjustable transmit power control</li> <li>Supports Automatic Transmit Power Control (ATPC)</li> </ul>   <strong>Outdoor Environmental Characteristics</strong> <ul> <li>IP65 rating; built-in TVS lightning protection</li> <li>IEEE 802.3 at Power over Ethernet design</li> <li>Operating temperature: -40~70 degrees C</li> </ul>   <strong>Multiple Operation Modes and Wireless Features</strong> <ul> <li>Multiple operation modes: AP (auto WDS), AP (TDMA), Station (WDS/TDMA) and Station (ARPNAT)</li> <li>Supports ATPC function to reduce mutual interference between the CPEs</li> <li>WMM (Wi-Fi multimedia) provides higher priority to multimedia transmitting over wireless</li> <li>Coverage threshold to limit the weak signal of clients occupying session</li> <li>Real-time Wi-Fi channel analysis chart and client limit control for better performance</li> <li>Supports Terminal Fast Roaming with 802.11k, 802.11v, and 802.11r</li> </ul>   <strong>Secure Network Connection</strong> <ul> <li>Full encryption supported: WPA/WPA2, WPA-PSK/WPA2-PSK authentication</li> <li>Supports 802.1Q tagged VLAN over WDS/TDMA</li> <li>Supports MAC address filtering</li> </ul>  
  • product_editor_4421_tab_enabled: yes
  • product_editor_4421_tab_content_changed: yes
  • product_editor_4421_tab_title: Key Features
  • product_editor_4422_tab_content:   <div class="table-responsive"> <table class="common_table_sky" style="width: 100%;"> <thead> <tr> <th colspan="2">Hardware</th> </tr> </thead> <tbody> <tr> <td class="align-middle">Standard Support</td> <td>IEEE 802.11a/n/ac IEEE 802.11i IEEE 802.3 10BASE-T IEEE 802.3u 100BASE-TX IEEE 802.3x flow control IEEE 802.11k, 802.11v, and 802.11r</td> </tr> <tr> <td class="align-middle">Dimensions(W x D x H)</td> <td>WBS-900AC:120 x 260 x 85 mm Antenna :Φ466 × 260 mm</td> </tr> <tr> <td class="align-middle">Weight</td> <td>WBS-900AC:333 g Antenna :1560 g</td> </tr> <tr> <td class="align-middle">Power Requirements</td> <td>Passive 48V DC inject (package included) or IEEE 802.3 at PoE+ or 12V DC IN</td> </tr> <tr> <td class="align-middle">Power Consumption (max.)</td> <td>< 15W per device</td> </tr> <tr> <td class="align-middle">Interface</td> <td>PoE: 1 x 10/100/1000BASE-TX, auto-MDI/MDIX, 802.3 at PoE In LAN: 1 x 10/100/1000BASE-TX, auto-MDI/MDIX</td> </tr> <tr> <td class="align-middle">Button</td> <td>Reset button</td> </tr> <tr> <td class="align-middle">Data Rate</td> <td>IEEE 802.11a: up to 54Mbps IEEE 802.11n (20MHz): up to 150Mbps IEEE 802.11n (40MHz): up to 300Mbps IEEE 802.11ac (80MHz): up to 867Mbps</td> </tr> <tr> <td class="align-middle">Media Access Control</td> <td>CSMA/CA</td> </tr> <tr> <td class="align-middle">Modulation</td> <td>802.11 a/n/ac: OFDM (BPSK / QPSK / 16QAM / 64QAM / 256QAM)</td> </tr> <tr> <td class="align-middle">Frequency Band</td> <td>5150~5850MHz</td> </tr> <tr> <td class="align-middle">Operating Channels</td> <td>5GHz channel: 36,40,44,48,52,56,60,64,100,104,108,112,116,120,124,128,149, 153, 157, 161</td> </tr> <tr> <td class="align-middle">Max. Transmit Power (dBm)</td> <td>Up to 25 dBm (country dependent)</td> </tr> <tr> <td class="align-middle">Receiver Sensitivity (dBm)</td> <td> <table class="table-bordered-bone" cellpadding="0"> <tbody> <tr> <td align="middle" bgcolor="#7f9cd3" width="200"><span style="color: #ffffff;">Network Mode</span></td> <td align="middle" bgcolor="#7f9cd3" width="200"><span style="color: #ffffff;">Data Rate</span></td> <td align="middle" bgcolor="#7f9cd3" width="200"><span style="color: #ffffff;">Receive Sensitivity (dBm)</span></td> </tr> <tr> <td align="middle" valign="”middle”" width="100">802.11a</td> <td align="middle" valign="middle" width="100">6Mbps 54Mbps</td> <td align="middle" valign="middle" width="200">-87 -69</td> </tr> <tr> <td align="middle" valign="”middle”" width="100">802.11n HT20</td> <td align="middle" valign="middle" width="100">MCS0 MCS7</td> <td align="middle" valign="middle" width="200">-87 -68</td> </tr> <tr> <td align="middle" valign="”middle”" width="100">802.11n HT40</td> <td align="middle" valign="middle" width="100">MCS0 MCS7</td> <td align="middle" valign="middle" width="200">-85 -65</td> </tr> <tr> <td align="middle" valign="”middle”" width="100">802.11AC</td> <td align="middle" valign="middle" width="100">MCS0 MCS9</td> <td align="middle" valign="middle" width="200">-87 -64</td> </tr> </tbody> </table> </td> </tr> <tr> <td class="align-middle">Antenna</td> <td>Dual-polarization dish antenna Gain:25 dBi Frequency range:5180 -5805 MHz Polarization:±45° Cross-pol Isolation:30 dBi VSWR:< 1.8 Azimuth beam width (H pol):6° Azimuth beam width (V pol):6° Elevation beam width:6°</td> </tr> </tbody> <thead> <tr> <th colspan="2">Environment & Certification</th> </tr> </thead> <tbody> <tr> <td class="align-middle">Operating Temperature</td> <td>-40 ~ 70 degrees C</td> </tr> <tr> <td class="align-middle">Operating Humidity</td> <td>5 ~ 95% (non-condensing)</td> </tr> <tr> <td class="align-middle">IP Level</td> <td>IP65</td> </tr> <tr> <td class="align-middle">ESD Protection</td> <td>± 6KV</td> </tr> <tr> <td class="align-middle">Surge Protection</td> <td>± 4kV</td> </tr> <tr> <td class="align-middle">Regulatory</td> <td>CE, RoHS</td> </tr> </tbody> <thead> <tr> <th colspan="2">Software</th> </tr> </thead> <tbody> <tr> <td class="align-middle">LAN</td> <td>Static IP/DHCP Supports Secondary IP</td> </tr> <tr> <td class="align-middle">Wireless Modes</td> <td>Access Point (auto WDS) Access Point (TDMA3) Station (WDS/TDMA3) Station (ARPNAT)</td> </tr> <tr> <td class="align-middle">Channel Width</td> <td>20MHz, 40MHz, 80MHz</td> </tr> <tr> <td class="align-middle">Encryption Type</td> <td>WPA, WPA-PSK, WPA2, WPA2-PSK</td> </tr> <tr> <td class="align-middle">Wireless Security</td> <td>Enable/Disable SSID Broadcast Wireless Max. 32 MAC address filtering User Isolation</td> </tr> <tr> <td class="align-middle">Max. SSIDs</td> <td>1</td> </tr> <tr> <td class="align-middle">Max. Wireless Clients</td> <td>128 (depending on usage)</td> </tr> <tr> <td class="align-middle">Wireless QoS</td> <td>Supports Wi-Fi Multimedia (WMM), 4 queues prioritization on TDMA</td> </tr> <tr> <td class="align-middle">Wireless Advanced</td> <td>Auto Channel Selection Transmit Power: 3 - 30 dBm Client Limit Control, Coverage Threshold Wi-Fi channel analysis chart Fast Roaming(IEEE 802.11k, 802.11r, 802.11v)</td> </tr> <tr> <td class="align-middle">Status Monitoring</td> <td>Device status, wireless client List DHCP client table System Log supports remote syslog server</td> </tr> <tr> <td class="align-middle">VLAN</td> <td>IEEE 802.1Q VLAN (VID: 2~4094)</td> </tr> <tr> <td class="align-middle">Management</td> <td>Remote management through HTTPS Configuration backup and restore Supports Bonjour (mDNS), CDP/LLDP, SSDP Supports GRE tunnel SNMP v1/v2c/v3 support</td> </tr> </tbody> </table> </div>
  • product_editor_4422_tab_enabled: yes
  • product_editor_4422_tab_content_changed: yes
  • product_editor_4422_tab_title: Specifications
  • ekit_post_views_count: 697
  • product_editor_4418_tab_sticky_width: pw-content-1
  • product_editor_4418_tab_sticky_position: pw-left-stick
  • product_editor_4421_tab_sticky_width: pw-content-1
  • product_editor_4421_tab_sticky_position: pw-left-stick
  • product_editor_4422_tab_sticky_width: pw-content-1
  • product_editor_4422_tab_sticky_position: pw-left-stick
  • product_editor_4423_tab_content:
  • product_editor_4423_tab_content_changed: yes
  • product_editor_4423_tab_enabled: yes
  • product_editor_4423_tab_title: Downloads
  • product_editor_4423_tab_sticky_width: pw-content-1
  • product_editor_4423_tab_sticky_height: 1
  • product_editor_4423_tab_sticky_position: pw-left-stick
  • product_editor_4424_tab_content:
  • product_editor_4424_tab_content_changed: yes
  • product_editor_4424_tab_enabled: yes
  • product_editor_4424_tab_title: Related Products
  • product_editor_4424_tab_sticky_width: pw-content-1
  • product_editor_4424_tab_sticky_height: 1
  • product_editor_4424_tab_sticky_position: pw-left-stick
  • total_sales: 0
  • product_label:
  • prouduct_loop_image_transparent_bg_:
  • 6_features_images: a:6:{i:0;i:14493;i:1;i:14492;i:2;i:14491;i:3;i:14490;i:4;i:7298;i:5;i:14488;}
  • datasheet_0_date: 20240517
  • datasheet_0_version: 2.0
  • datasheet_0_description: WBS-900AC
  • datasheet_0_download_pdf: https://www.planet.com.sa/storage/products/wbs-900ac-v2/C-WBS-900ACv2_L.pdf
  • datasheet: 1
  • quick_guide_0_date: 20240621
  • quick_guide_0_version: 2.1
  • quick_guide_0_description: [Release for hardware version 2.0.] Added PSTI function.
  • quick_guide_0_download_pdf: https://www.planet.com.sa/storage/products/wbs-900ac-v2/EMQ-WBS-900AC_v2.1.pdf
  • quick_guide_1_date: 20240510
  • quick_guide_1_version: 2.0
  • quick_guide_1_description: Release for hardware version 2.0.
  • quick_guide_1_download_pdf: https://www.planet.com.sa/storage/products/wbs-900ac-v2/EMQ-WBS-900AC_v2.0.pdf
  • quick_guide: 2
  • users_manual_0_date: 20240517
  • users_manual_0_version: 2.0
  • users_manual_0_description: Release for hardware version 2.0.
  • users_manual_0_download_pdf: https://www.planet.com.sa/storage/products/wbs-900ac-v2/EM-WBS-900AC_v2.0.pdf
  • users_manual: 1
  • ec_declaration: 1
  • android_app:
  • driver:
  • firmware:
  • utility:
  • compatible_list:
  • site-sidebar-layout: default
  • ast-site-content-layout: default
  • site-content-style: default
  • site-sidebar-style: default
  • theme-transparent-header-meta: default
  • accessories_table: <table class="common_table"> <thead> <tr> <th colspan="2">Ordering Information</th> </tr> </thead> <tbody> <tr> <td class="text-center align-middle" style="width:30%; padding:15px; border:1px solid #eee;"> <h3 class="h6 m-0" style="margin:0;">WBS-900AC</h3> </td> <td style="padding:15px; border:1px solid #eee;">5GHz 802.11ac 900Mbps TDMA Outdoor Long Range Wireless CPE</td> </tr> </tbody> </table>
  • applications_tab: <p><strong>Long-distance Connection </strong><p>PLANET WBS-900AC is specially designed for long-distance outdoor wireless bridge solutions, capable of establishing a stable bridge connection with a 25dBi high gain dish antenna to provide long-range connection and maximum performance. It supports TDMA technology, reducing interference between users by allowing them to transmit at different times, even when a large number of users share the same frequency band. It is easy to install and adjust suitable settings in appropriate locations. In terms of management, the WBS-900AC features adjustable transmit power control and IEEE 802.1Q VLAN, regulating network data transfer by delaying less important or less desired packets. </p><p><img style="display: block; margin-left: auto; margin-right: auto;" src="https://www.planet.com.sa/wp-content/uploads/2025/01/WBS-900ACv2-3.png" alt="" width="700" height="245"></p></p>
  • key_features_tab: <p><strong>Industrial Compliant Wireless LAN and LAN</strong><ul> <li>Compliant with time-division multiple access (TDMA) wireless technology</li> <li>Compliant with the IEEE 802.11a/n/ac WAVE2 MU-MIMO wireless technology</li> <li>2T2R architecture with data rate of up to 900Mbps</li> <li>Equipped with two 10/100/1000Mbps RJ45 ports with auto MDI/MDI-X supported</li> </ul><p> </p><p><strong>RF Interface Characteristics</strong></p><ul> <li>25dBi dual-polarization antenna</li> <li>High output power with multiply-adjustable transmit power control</li> <li>Supports Automatic Transmit Power Control (ATPC)</li> </ul><p> </p><p><strong>Outdoor Environmental Characteristics</strong></p><ul> <li>IP65 rating; built-in TVS lightning protection </li> <li>IEEE 802.3 at Power over Ethernet design</li> <li>Operating temperature: -40~70 degrees C</li> </ul><p> </p><p><strong>Multiple Operation Modes and Wireless Features</strong></p><ul> <li>Multiple operation modes: AP (auto WDS), AP (TDMA), Station (WDS/TDMA) and Station (ARPNAT)</li> <li>Supports ATPC function to reduce mutual interference between the CPEs</li> <li>WMM (Wi-Fi multimedia) provides higher priority to multimedia transmitting over wireless</li> <li>Coverage threshold to limit the weak signal of clients occupying session</li> <li>Real-time Wi-Fi channel analysis chart and client limit control for better performance</li> <li>Supports Terminal Fast Roaming with 802.11k, 802.11v, and 802.11r</li> </ul><p> </p><p><strong>Secure Network Connection</strong></p><ul> <li>Full encryption supported: WPA/WPA2, WPA-PSK/WPA2-PSK authentication</li> <li>Supports 802.1Q tagged VLAN over WDS/TDMA </li> <li>Supports MAC address filtering</li> </ul><p> </p></p>
  • specifications_tab: <table style="width:100%;" class="common_table_sky"><thead><tr><th colspan="2">Hardware</th></tr></thead><tbody><tr><td class="align-middle">Standard Support</td><td>IEEE 802.11a/n/ac<br /> IEEE 802.11i<br /> IEEE 802.3 10BASE-T<br /> IEEE 802.3u 100BASE-TX<br /> IEEE 802.3x flow control<br /> IEEE 802.11k, 802.11v, and 802.11r</td></tr><tr><td class="align-middle">Dimensions(W x D x H)</td><td>WBS-900AC:120 x 260 x 85 mm <br /> Antenna :Φ466 × 260 mm</td></tr><tr><td class="align-middle">Weight</td><td>WBS-900AC:333 g<br /> Antenna :1560 g</td></tr><tr><td class="align-middle">Power Requirements</td><td>Passive 48V DC inject (package included) or<br /> IEEE 802.3 at PoE+ or 12V DC IN</td></tr><tr><td class="align-middle">Power Consumption (max.)</td><td>< 15W per device</td></tr><tr><td class="align-middle">Interface</td><td>PoE: 1 x 10/100/1000BASE-TX, auto-MDI/MDIX, 802.3 at PoE In<br /> LAN: 1 x 10/100/1000BASE-TX, auto-MDI/MDIX</td></tr><tr><td class="align-middle">Button</td><td>Reset button</td></tr><tr><td class="align-middle">Data Rate</td><td>IEEE 802.11a: up to 54Mbps <br /> IEEE 802.11n (20MHz): up to 150Mbps <br /> IEEE 802.11n (40MHz): up to 300Mbps<br /> IEEE 802.11ac (80MHz): up to 867Mbps</td></tr><tr><td class="align-middle">Media Access Control</td><td>CSMA/CA</td></tr><tr><td class="align-middle">Modulation</td><td>802.11 a/n/ac: OFDM (BPSK / QPSK / 16QAM / 64QAM / 256QAM)</td></tr><tr><td class="align-middle">Frequency Band</td><td>5150~5850MHz</td></tr><tr><td class="align-middle">Operating Channels</td><td>5GHz channel: 36,40,44,48,52,56,60,64,100,104,108,112,116,120,124,128,149, 153, 157, 161</td></tr><tr><td class="align-middle">Max. Transmit Power (dBm)</td><td>Up to 25 dBm (country dependent)</td></tr><tr><td class="align-middle">Receiver Sensitivity (dBm)</td><td><table class="table-bordered-bone" cellpadding="0"><tr><td width="200" align="middle" bgcolor="#7f9cd3"><font color="#FFFFFF">Network Mode</font></td><td width="200" align="middle" bgcolor="#7f9cd3"><font color="#FFFFFF">Data Rate</font></td><td width="200" align="middle" bgcolor="#7f9cd3"><font color="#FFFFFF">Receive Sensitivity (dBm)</font></td></tr><tr><td width="100" align="middle" valign=”middle”>802.11a</td><td width="100" align="middle" valign="middle">6Mbps<br>54Mbps</td><td width="200" align="middle" valign="middle">-87<br>-69</td></tr><tr><td width="100" align="middle" valign=”middle”>802.11n HT20</td><td width="100" align="middle" valign="middle">MCS0<br>MCS7 </td><td width="200" align="middle" valign="middle">-87<br>-68</td></tr><tr><td width="100" align="middle" valign=”middle”>802.11n HT40</td><td width="100" align="middle" valign="middle"> MCS0<br>MCS7</td><td width="200" align="middle" valign="middle">-85<br>-65</td></tr><tr><td width="100" align="middle" valign=”middle”>802.11AC</td><td width="100" align="middle" valign="middle">MCS0<br>MCS9</td><td width="200" align="middle" valign="middle">-87<br>-64</td></tr></table></td></tr><tr><td class="align-middle">Antenna</td><td>Dual-polarization dish antenna<br />  Gain:25 dBi<br />  Frequency range:5180 -5805 MHz<br />  Polarization:±45°<br />  Cross-pol Isolation:30 dBi<br />  VSWR:< 1.8<br />  Azimuth beam width (H pol):6°<br />  Azimuth beam width (V pol):6°<br />  Elevation beam width:6°</td></tr></tbody><thead><tr><th colspan="2">Environment & Certification</th></tr></thead><tbody><tr><td class="align-middle">Operating Temperature</td><td>-40 ~ 70 degrees C</td></tr><tr><td class="align-middle">Operating Humidity</td><td>5 ~ 95% (non-condensing)</td></tr><tr><td class="align-middle">IP Level</td><td>IP65</td></tr><tr><td class="align-middle">ESD Protection</td><td>± 6KV</td></tr><tr><td class="align-middle">Surge Protection</td><td>± 4kV</td></tr><tr><td class="align-middle">Regulatory</td><td>CE, RoHS</td></tr></tbody><thead><tr><th colspan="2">Software</th></tr></thead><tbody><tr><td class="align-middle">LAN</td><td>Static IP/DHCP<br /> Supports Secondary IP</td></tr><tr><td class="align-middle">Wireless Modes</td><td>Access Point (auto WDS)<br /> Access Point (TDMA3)<br /> Station (WDS/TDMA3)<br /> Station (ARPNAT)</td></tr><tr><td class="align-middle">Channel Width</td><td>20MHz, 40MHz, 80MHz</td></tr><tr><td class="align-middle">Encryption Type</td><td>WPA, WPA-PSK, WPA2, WPA2-PSK</td></tr><tr><td class="align-middle">Wireless Security</td><td>Enable/Disable SSID Broadcast<br /> Wireless Max. 32 MAC address filtering<br /> User Isolation</td></tr><tr><td class="align-middle">Max. SSIDs</td><td>1</td></tr><tr><td class="align-middle">Max. Wireless Clients</td><td>128 (depending on usage)</td></tr><tr><td class="align-middle">Wireless QoS</td><td>Supports Wi-Fi Multimedia (WMM), 4 queues prioritization on TDMA</td></tr><tr><td class="align-middle">Wireless Advanced</td><td>Auto Channel Selection <br /> Transmit Power: 3 - 30 dBm<br /> Client Limit Control, Coverage Threshold<br /> Wi-Fi channel analysis chart<br /> Fast Roaming(IEEE 802.11k, 802.11r, 802.11v)</td></tr><tr><td class="align-middle">Status Monitoring</td><td>Device status, wireless client List<br /> DHCP client table<br /> System Log supports remote syslog server</td></tr><tr><td class="align-middle">VLAN</td><td>IEEE 802.1Q VLAN (VID: 2~4094)</td></tr><tr><td class="align-middle">Management</td><td>Remote management through HTTPS<br /> Configuration backup and restore<br /> Supports Bonjour (mDNS), CDP/LLDP, SSDP<br /> Supports GRE tunnel<br /> SNMP v1/v2c/v3 support</td></tr></tbody></table>
  • astra-migrate-meta-layouts: set
  • rank_math_news_sitemap_robots: index
  • rank_math_robots: a:1:{i:0;s:5:"index";}
  • rank_math_internal_links_processed: 1
  • rank_math_primary_product_cat: 265
  • ec_declaration_0_date: 20240927
  • ec_declaration_0_version: 2.0
  • ec_declaration_0_description: EC Declaration.
  • ec_declaration_0_download_pdf: https://www.planet.com.sa/storage/products/wbs-900ac-v2/WBS-900ACv2.pdf
  • hide_related_products_tab: 0
  • rank_math_focus_keyword: WBS-900AC

5GHz 802.11ac 900Mbps TDMA Outdoor Long Range Wireless CPE

» WBS-900AC

Stable and Reliable Long-range Outdoor Wireless Solution 

PLANET’s newly-revised WBS-900AC 5GHz 802.11ac 900Mbps TDMA Outdoor Long-range Wireless CPE offers a long-range and excellent throughput better than those of traditional wireless devices. One of its standout features is its seamless design, making installation easy. With the standard IEEE 802.3at Power over Ethernet (PoE), the WBS-900AC CPE can be easily installed in areas where power outlets are not available, further enhancing its versatility and ease of deployment. Its PoE capability is designed for both end-span and mid-span configurations, providing flexibility in deployment options. 

Whether connecting directly to an end-span PoE switch or through a mid-span PoE injector, the WBS-900AC CPE ensures seamless integration into the existing network infrastructure. The WBS-900AC excels in providing wireless long-distance city-to-city connectivity for all applications. Leveraging TDMA (Time division multiple access ) and ATPC (Automatic Transmit Power Control) technologies, it allows multiple users to share the same frequency band without interference, thanks to its intelligent scheduling that assigns different time slots for transmission. This ensures efficient spectrum utilization and reliable performance even in congested environments. Moreover, the WBS-900AC boasts an IP65-rated outdoor enclosure, making it resilient against rigorous weather conditions. Its rugged construction enables it to withstand harsh outdoor environments, ensuring uninterrupted operation in any situation. Overall, the WBS-900AC combines seamless integration, long-range connectivity, and robust weather resistance, making it an ideal choice for various outdoor wireless applications.

WBS 900ACv2 4 

Benefits of TDMA and ATPC

TDMA is a channel access method for shared-medium networks. It allows several users to share the same frequency channel by dividing the signal into different time slots. The users transmit in rapid succession, one after the other, each using its own time slot. This allows multiple stations to share the same transmission medium while using only a part of its channel capacity. With the TDMA technology, the WBS-900AC reduces interference between users by allowing them to transmit at different times. It provides a better quality data transmission compared to other techniques because it reduces interference and allows for more efficient use of the available frequency spectrum. The ATPC, providing automatic wireless signal adjustment in accordance with the environment, reduces mutual interference between the CPEs, and improves the stability of data transmission.

 

Benefits of MU-MIMO under 802.11ac Wave 2

With the MU-MIMO Wave 2 technology, the WBS-900AC, installed in public areas such as hotspots, airports and conferences, reduces the frustration that Wi-Fi users often experience in downloading web pages, e-mail file attachments and media contents. For cellular operators, the WBS-900AC provides a better Wi-Fi user experience, reducing the likelihood of users turning off Wi-Fi and putting more load on the cellular network. For enterprises, this technology also can solve Wi-Fi congestion issues in open work spaces and conference rooms.

WBS 900ACv2 1 

Flexible, Durable and Reliable Outdoor Characteristics

To reach maximum reliability in the harsh environment, the WBS-900AC not only comes with IP65-rated casing, but also adopts the Qualcomm Chipset Solution, capable of withstanding wide temperature ranging from -40 to 70 degrees C. Designed with the IEEE 802.3at PoE+ (Power over Ethernet) power scheme, the WBS-900AC can be easily installed in the areas where power outlets are not available. Furthermore, it is also suitable to be integrated with PLANET Renewable Powered PoE System to offer farther wireless service in remote areas. 

 WBS 900ACv2 5

Designed for Various Requirements

The WBS-900AC is specially designed for long-distance outdoor wireless solutions that are capable of establishing stable bridge connection with 25dBi high gain dish antenna. To provide long range and maximum performance., the WBS-900AC can implement 3 operation modes and is easy to use where a multitude of applications in communities, warehouses, campuses, harbors, etc. can be made.

 

WBS 900ACv2 2

Long-distance Connection 

PLANET WBS-900AC is specially designed for long-distance outdoor wireless bridge solutions, capable of establishing a stable bridge connection with a 25dBi high gain dish antenna to provide long-range connection and maximum performance. It supports TDMA technology, reducing interference between users by allowing them to transmit at different times, even when a large number of users share the same frequency band. It is easy to install and adjust suitable settings in appropriate locations. In terms of management, the WBS-900AC features adjustable transmit power control and IEEE 802.1Q VLAN, regulating network data transfer by delaying less important or less desired packets. 

Industrial Compliant Wireless LAN and LAN

  • Compliant with time-division multiple access (TDMA) wireless technology
  • Compliant with the IEEE 802.11a/n/ac WAVE2 MU-MIMO wireless technology
  • 2T2R architecture with data rate of up to 900Mbps
  • Equipped with two 10/100/1000Mbps RJ45 ports with auto MDI/MDI-X supported

 

RF Interface Characteristics

  • 25dBi dual-polarization antenna
  • High output power with multiply-adjustable transmit power control
  • Supports Automatic Transmit Power Control (ATPC)

 

Outdoor Environmental Characteristics

  • IP65 rating; built-in TVS lightning protection 
  • IEEE 802.3 at Power over Ethernet design
  • Operating temperature: -40~70 degrees C

 

Multiple Operation Modes and Wireless Features

  • Multiple operation modes: AP (auto WDS), AP (TDMA), Station (WDS/TDMA) and Station (ARPNAT)
  • Supports ATPC function to reduce mutual interference between the CPEs
  • WMM (Wi-Fi multimedia) provides higher priority to multimedia transmitting over wireless
  • Coverage threshold to limit the weak signal of clients occupying session
  • Real-time Wi-Fi channel analysis chart and client limit control for better performance
  • Supports Terminal Fast Roaming with 802.11k, 802.11v, and 802.11r

 

Secure Network Connection

  • Full encryption supported: WPA/WPA2, WPA-PSK/WPA2-PSK authentication
  • Supports 802.1Q tagged VLAN over WDS/TDMA 
  • Supports MAC address filtering

 

Hardware
Standard SupportIEEE 802.11a/n/ac
IEEE 802.11i
IEEE 802.3 10BASE-T
IEEE 802.3u 100BASE-TX
IEEE 802.3x flow control
IEEE 802.11k, 802.11v, and 802.11r
Dimensions(W x D x H)WBS-900AC:120 x 260 x 85 mm
Antenna :Φ466 × 260 mm
WeightWBS-900AC:333 g
Antenna :1560 g
Power RequirementsPassive 48V DC inject (package included) or
IEEE 802.3 at PoE+ or 12V DC IN
Power Consumption (max.)< 15W per device
InterfacePoE: 1 x 10/100/1000BASE-TX, auto-MDI/MDIX, 802.3 at PoE In
LAN: 1 x 10/100/1000BASE-TX, auto-MDI/MDIX
ButtonReset button
Data RateIEEE 802.11a: up to 54Mbps
IEEE 802.11n (20MHz): up to 150Mbps
IEEE 802.11n (40MHz): up to 300Mbps
IEEE 802.11ac (80MHz): up to 867Mbps
Media Access ControlCSMA/CA
Modulation802.11 a/n/ac: OFDM (BPSK / QPSK / 16QAM / 64QAM / 256QAM)
Frequency Band5150~5850MHz
Operating Channels5GHz channel: 36,40,44,48,52,56,60,64,100,104,108,112,116,120,124,128,149, 153, 157, 161
Max. Transmit Power (dBm)Up to 25 dBm (country dependent)
Receiver Sensitivity (dBm)
Network ModeData RateReceive Sensitivity (dBm)
802.11a6Mbps
54Mbps
-87
-69
802.11n HT20MCS0
MCS7
-87
-68
802.11n HT40 MCS0
MCS7
-85
-65
802.11ACMCS0
MCS9
-87
-64
AntennaDual-polarization dish antenna
 Gain:25 dBi
 Frequency range:5180 -5805 MHz
 Polarization:±45°
 Cross-pol Isolation:30 dBi
 VSWR:< 1.8
 Azimuth beam width (H pol):6°
 Azimuth beam width (V pol):6°
 Elevation beam width:6°
Environment & Certification
Operating Temperature-40 ~ 70 degrees C
Operating Humidity5 ~ 95% (non-condensing)
IP LevelIP65
ESD Protection± 6KV
Surge Protection± 4kV
RegulatoryCE, RoHS
Software
LANStatic IP/DHCP
Supports Secondary IP
Wireless ModesAccess Point (auto WDS)
Access Point (TDMA3)
Station (WDS/TDMA3)
Station (ARPNAT)
Channel Width20MHz, 40MHz, 80MHz
Encryption TypeWPA, WPA-PSK, WPA2, WPA2-PSK
Wireless SecurityEnable/Disable SSID Broadcast
Wireless Max. 32 MAC address filtering
User Isolation
Max. SSIDs1
Max. Wireless Clients128 (depending on usage)
Wireless QoSSupports Wi-Fi Multimedia (WMM), 4 queues prioritization on TDMA
Wireless AdvancedAuto Channel Selection
Transmit Power: 3 – 30 dBm
Client Limit Control, Coverage Threshold
Wi-Fi channel analysis chart
Fast Roaming(IEEE 802.11k, 802.11r, 802.11v)
Status MonitoringDevice status, wireless client List
DHCP client table
System Log supports remote syslog server
VLANIEEE 802.1Q VLAN (VID: 2~4094)
ManagementRemote management through HTTPS
Configuration backup and restore
Supports Bonjour (mDNS), CDP/LLDP, SSDP
Supports GRE tunnel
SNMP v1/v2c/v3 support
DateVersionDescriptionDownload
2024/17/052.0

WBS-900AC

Download Icon
DateVersionDescriptionDownload
2024/21/062.1

[Release for hardware version 2.0.]
Added PSTI function.

Download Icon
2024/10/052.0

Release for hardware version 2.0.

Download Icon
DateVersionDescriptionDownload
2024/17/052.0

Release for hardware version 2.0.

Download Icon
DateVersionDescriptionDownload
2024/27/092.0

EC Declaration.

Download Icon

Ordering Information

WBS-900AC

5GHz 802.11ac 900Mbps TDMA Outdoor Long Range Wireless CPE

Ordering Information

WBS-900AC

5GHz 802.11ac 900Mbps TDMA Outdoor Long Range Wireless CPE
✉

Join Our Newsletter

Get the latest news, offers and updates from PLANET Technology straight to your inbox.

We respect your privacy. Unsubscribe anytime.

Subscribe to PLANET e Newsletter

Receive the latest product information and company news!